Ken Mattingly was moved within the guidance crew into parallel education with Anders as backup CMP in the event Apollo eleven was delayed previous its intended July start date, at which issue Anders might be unavailable.[59]Upon arrival for the Vertical Assembly Developing, Each individual stage was inspected in a very horizontal position ahead of